Abstract

The multi-institutional ARIES team has completed a series of four steady-state and two pulsed cost-optimized conceptual designs of commercial tokamak fusion power plants. The level of assumed advances in technology and physics was varied from one design to the next. The cost benefits of various design options are compared quantitatively with an emphasis placed on pulsed versus steady-state operation. Possible means to improve the economic competitiveness of fusion are suggested.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.