Abstract

ABSTRACT Some approaches to the use of linguistic-preference models based on fuzzy relations in the context of multiple factor project assessment are considered. Projects are characterized in terms of linguistic expressions of “performance” with respect to factors or impacts and the “importance” of those factors and impacts. Some variations of methods by Wilhelm and Parsaei (1991) and Eldukair and Ayyub (1992) are considered with some possible analogous methods. A simple illustrative, hypothetical example is developed to compare methods in the context of a proposed bridge river crossing in the city of Brisbane, Queensland, Australia, assessed against six factors: (1) cost, (2) lifespan, (3) usage, (4) aesthetics, (5) construction time, and (6) environmental impact.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.