Abstract

AbstractCapacity management is the planning and leveling of resources required (load) against the resources available (capacity). In this study, the lot size models used by Material Requirements Planning (MRP) had a major effect on the work center load profiles generated by Capacity Requirements Planning (CRP). Therefore, the selection of lot size models for MRP systems is an important decision for capacity management as well as materials management.The results of this study highlight the operating characteristics of specific lot size models considering setup, inventory carrying, and capacity associated costs. For example, the Economic Order Quantity model and the Lot‐For‐Lot model in certain situations can help level load. The Periodic Order Quantity and Least Total Cost models especially for high cost structure ratios tend to result in erratic and lumpy work center load profiles. The reasons for such operating behavior are examined. Other concepts and relationships important to capacity management are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.