Abstract
This article models a single-stage hybrid production system, which can be regarded as a Make To Order (MTO) production system with safety stocks or a Make To Stock (MTS) production system with advance demand information. In an environment with multiple products and variable customer due dates, optimality conditions for safety stocks (base stocks) and safety lead times (work-ahead window) that minimize inventory and backorder costs are derived. For a simplified M/M/1 system with exponentially distributed customer required lead time, an explicit comparison between MTO and MTS is conducted. A pure MTO policy gets relatively more favorable to a pure MTS policy if inventory holding costs increase, backorder costs decrease, the mean customer required lead time increases, or the processing rate increases. In a numerical study, the influence of variance, the behavior of optimal parameters, and the cost reduction potential of this hybrid policy are shown.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.