Abstract

International investors in large infrastructure projects face numerous risks. To explore this issue, this paper compares the development of two hydropower stations in Rasuwa District, Nepal: Upper Trishuli 3A, which is fully funded by a Chinese government bank, and Rasuwagadhi, which is fully funded by local government banks. The construction of these two plants was compared between 2012 and 2020 using a visual interpretation method to extract data on roads, buildings, dams, and vehicles from 1-m-resolution remote sensing imagery. Two methods were used to compare the environmental impacts of each plant. Landsat 7/8 30-m imagery was used to monitor changes in the normalized difference vegetation index around the Upper Trishuli 3A hydropower station from 2012 to 2020 and around the Rasuwagadhi hydropower station from 2014 to 2020. Then, 1-m-resolution imagery was used to observe land-cover differences in these areas and time periods. The results indicate that: (1) despite various challenges, such as geological disasters, the COVID-19 pandemic, and a blockade by the Indian government, there was no difference in construction progress between the two hydropower stations. (2) The Upper Trishuli 3A Hydropower Station was associated with better environmental protection work, as there were continuous declines in vegetation growth near Rasuwagadhi and increased overall vegetation growth near Upper Trishuli 3A. (3) Energy projects funded by the Belt and Road Initiative have benefited developing countries enormously. Finally, local conditions should be thoroughly investigated during the construction of foreign-funded power stations.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call