Abstract

Much of the research on operations scheduling problems has either ignored setup times or assumed that setup times on each machine are independent of the job sequence. This paper considers the problem of scheduling a single machine for minimizing total tardiness in a sequence dependent setup environment. The comparative performance of branch-and-bound, genetic search, simulated annealing and random-start pairwise interchange was evaluated in this problem setting. The experimental results suggest that simulated annealing and random-start pairwise interchange are viable solution techniques that can yield good solutions to a large combinatorial problem when considering the tardiness objective with sequence dependent setup times. However, branch-and-bound may be the preferred solution technique in solving smaller problems, and it is the only solution technique tested that will confirm an optimum solution has been reached. The methods considered in this research offer promise to deal with a class of scheduling problems, which have been considered difficult by both researchers and practitioners.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.