Abstract

This work aims to analyse, from the point of view of long-term electrical power sector planning, the regulatory aspects for the implementation of offshore gas-to-wire (GtW) technology, focusing on a Brazilian case study and pre-salt fields. The main results show that in terms of implementation, offshore GtW must be auctioned as a structuring project and offshore transmission for the GtW power plant could adopt the same model used for Itaipú transmission or be attached to the Basic Network, GtW also requires a practice of priority dispatch, by a contract of quantity (and not availability). Policy changes are urgently needed to coordinate regulation of the electricity and gas sectors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.