Abstract

ABSTRACT The relationship between activity-based costing (ABC) and time-driven activity-based costing (TDABC) has not been systematically investigated. We compare the two systems analytically and via a numerical experiment. Our analytical comparison generates formulas that describe how each system maps resources to activities and finally to products. We demonstrate that ABC aggregates resource-to-activity information by resources (columns), while TDABC selects partitions of activity-by-resource information. Our numerical experiment shows that TDABC is more accurate than ABC when traceability of resources to activities is high and activity traceability to products is low, while ABC is more accurate when activities are more traceable to products, irrespective of the level of resource traceability to activities. Finally, we examine the impact of hybridizing an ABC (TDABC) system with TDABC (ABC). We find that adding one ABC element into a TDABC system usually improves accuracy. However, adding one TDABC element into an ABC system usually substantially degrades accuracy. Data Availability: The simulated datasets are available from the first author on request.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.