Abstract

The NEMO Collaboration is involved in an intense activity to develop, apply and test technical solutions for an underwater laboratory with two prototypes called NEMO Phase 1 and NEMO Phase 2. In this framework both options of AC and DC power feeding systems have been explored. The design, realization, test and operation of NEMO Phase 1 AC electrical power and control systems were carried out and concluded. The operational experience with this system will be reported. Presently the design and realization of the DC power system of NEMO Phase 2 is under way. Both these systems are described and compared, with a special focus on the results of NEMO Phase 1, on the tower power subsystem, and on the long term high pressure tests that have been carried out on the electric and electronic devices.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.