Abstract

The effects of organic loading rate (OLR) on simultaneous phosphorus (P) and alginate-like exopolymers (ALE) recovery from bacterial aerobic granular sludge (AGS) and algal-bacterial AGS were examined and compared during 70 days’ operation. With the increase of OLR (0.6–1.2 g COD/(L·day)), both AGS showed good settleability and granular strength with P bioavailability > 92% (Stage III). The moderate increase in OLR had a positive influence on simultaneous recovery of P and ALE. On day 60, the contents of ALE and guluronic acid/guluronic acid (GG) blocks reached the highest in algal-bacterial AGS, about 13.37 and 2.13 mg/g-volatile suspended solids (VSS), respectively. Meanwhile, about daily 0.55 kg of P is estimated to be recovered from the wastewater treatment plant with a treatment capacity of 10,000 m3/day. P mass balance analysis during ALE extraction from both AGS was conducive to further evaluation of P removal pathway and its application potentials.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.