Abstract

This work is an investigation about the relative effectiveness of two approaches to scheduling in flexible flow shops: one approach advocating the possible use of different dispatching rules at different stages of the flow shop, and the other suggesting the use of the same dispatching rule at all the stages of the flow shop. In the latter approach, the dispatching rule contains the information related to both process time and duedate. Both approaches aim at the minimization of measures related to flowtime and tardiness of jobs. This paper essentially is an attempt at exploring the relative effectiveness of these two approaches to scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.