Abstract

This article particular introduce the double-shear wall template installation construction technology, construction points, construction quality control, safety precautions and the mode of material saving, which is a commercial bank’s integration business building underground vault with a special requirement. Making the construction step, the construction point and inspecting, in accordance with the construction method, construction point, construction procedure, methods of the materials processing, quality criterion, safety measures, materials saving measures, is not only to meet the usage function of the design requirements and requirement of the project quality, but also to save material,achieve the purpose of cost reduction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.