Abstract
This paper investigates an optimal scheduling method for the operation of combined cycle gas turbines (CCGT). The objective is to minimize the CO2 emissions while supplying both electrical and thermal loads. This paper adopts a detailed model of the units in order to relate the heat and power outputs. The grid constraints as well as system losses are considered for both the electrical and thermal systems. Finally, the optimal power dispatch lies on the hybridization of a mixed integer linear programing scheduling with a greedy search method. Different sets of simulations are run for a small 5-bus test case and a larger model of Jurong Island in Singapore. Several load levels are considered for the heat demand, and the impact of the steam pipe capacities is highlighted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.