Abstract

This paper studies the model of power system adapted to the new energy generation and power market environment. A collaborative planning model of power source considering the uncertainty of the new energy and the power market is proposed. The construction of coal-fired thermal power generating units, wind power generators and transmission lines are considered. At the same time, in view of the uncertainty of wind power generation and electricity market, considering from two perspectives: the randomness of wind power output and the use of geometric Brownian motion to predict electricity price. Finally, the example application of the IEEE 30-bus system shows that the model can effectively coordinate the construction scheme of power grid and power supply.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.