Abstract
In order to improve the science of grid equipment overhaul and decommissioning decisions, a collaborative optimization method of equipment overhaul/decommissioning strategy considering system effectiveness and risk is proposed. The interaction effect between overhaul and decommissioning is analysed from the perspective of system effectiveness, and 2 attributes of integrated cost input and system reliability improvement are proposed, and then a prospect model with cost/benefit attributes is established based on the prospect theory. Then, with the maximum integrated prospect value as the optimization objective, a collaborative optimization model of overhaul/decommissioning strategy is established with the system risk level as the constraint. Finally, the effectiveness of the proposed method is verified by taking the transformer equipment of an urban area distribution network as an example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.