Abstract

Lot streaming is a technique of splitting lots into sublots to allow the overlapping of successive operations in a multi-stage manufacturing system. In this research, we present a course-grained parallel genetic algorithm to solve a lot streaming problem in a flexible job-shops environment. We consider routing flexibility, sequence dependent setups, attached or detached nature of setups, machine release dates and lag times in an integrated manner. The proposed parallel genetic algorithm was implemented based on island-model parallelization techniques with different connection topologies. Numerical examples are presented to illustrate the computation behavior of the parallel genetic algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.