Abstract
The objective of this study was to develop scheduling solutions for chemical vessels in a port. Chemical tankers carry multiple liquid cargos and have to visit multiple terminals to load/unload these cargos. The practice to date in scheduling these loading/unloading activities for the Port of Houston (PoH) has primarily involved manual methods, which result in several inefficiencies such as long waiting times and inefficient resource utilisation. This paper proposes three methods for tanker-scheduling problems, formulated as an open-shop scheduling problem with sequence-dependent post-set-up times: a mixed-integer programming (MIP); a constraint programming (CP); and a dispatching rule, longest processing time (LPT) scheduling heuristic. Overall, the results showed the MIP method to be a more suitable tool for hourly and daily scheduling, whereas the CP and the LPT heuristic proved suitable for longer-horizon scheduling problems (weekly, monthly, or semi-annual) and for use as real-time scheduling tools.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.