Abstract

Decision-making in the early stage of a project has a significant impact on the project. However, limited and uncertain information on the project and a complex correlation among various factors that affect the project’s construction duration and cost, make it difficult to predict and manage the project. Therefore, this study developed a case-based reasoning (CBR)-based hybrid model with which to predict the construction duration and cost of a project in its early stage. One hundred and one cases among multi-family housing projects that were completed between 2000 and 2005 were used. The CBR-based hybrid model developed in this study is the result of integrating the advantages of (i) prediction methodologies, such as case-based reasoning, multiple regression analysis, and artificial neural networks, (ii) the optimization process using a genetic algorithm, and (iii) the probability distribution and the analysis process of outlier using Monte-Carlo simulation. The results of this study are expected to support the owners and managers who are in charge of estimating budget and construction duration in both public and private sectors, in predicting accurately the construction duration and cost at the business planning or early stage of a project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.