Abstract

Abstract Optimum decision making is an ongoing problem in production engineering. Dynamic well characteristics during the project life, different reservoir and well conditions, and policies of the companies lead to complex problems. Today, the most effective liquid-removal devices are pumping, the combination of liquid-diverter with gas lift and velocity string. Considering mentioned complexities, the most efficient method of liquid removal is different from one well to the others. This paper discusses a multi-criteria decision making (MCDM) strategy for ranking these methods based on ELECTRE and TOPSIS techniques in a gas condensate reservoir. The most efficient model in this case, regarding its high efficiency and level of reliability is continuous gas lift. These procedures can be extended to other cases easily by changing the comparison matrix and user defined weights.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.