Abstract

This paper presents a case study on the collapse caused by sudden groundwater ingression in the Pinglin pilot tunnel, and the treatments developed for the adverse ground conditions encountered. The ideas for the ground treatment are to reduce groundwater pressure as well as to consolidate the fractured zone in rock formations. The paper highlights the importance of paying particular attention to the ground treatment process and grouting quality control. Ongoing adjustments of grouting mixture and pressure may be necessary with the changing ground conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.