Abstract

Abstract A failure analysis investigation was carried out on the secondary Superheater tubes of a boiler unit in a steam power plant. The tubes, made of DIN-16CrMo4 steel, failed by bulging and rupture only after about three years of operation. Metallurgical investigations revealed that microstructural degradation had mainly occurred at the external (fireside) tube surface. Long-term overheating was identified as the root cause of the premature failure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.