Abstract
The detailed data including spatial concept is not transmitted in the detailed data including the spatial concept in the statement of internal construction sites, and the integrated management of cost and process is not carried out because the construction is carried out on the site with cost-oriented details. so doing a double task of generating the necessary work breakdown structure (WBS) and spatial concept detailed data. In order to solve these problems, in this paper, the classification of information using building information model (BIM) object-based properties, 3D object creation standards, cost, and process information are presented centering on the case of highway construction sites. In the future, BIM-based cost-process integration proposes an efficient construction management practice through management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.