Abstract
Because the urban tunnel is an essential knot of urban traffic and an easy blocking point in busy hours, upgrading the urban tunnel was necessary for the city after the tunnel being in service for a long time. However, to demolish the existing tunnel, some problems may be encountered, and these problems include occurrence of longitudinal cracks at the tunnel vault, increase of load due to infrastructure construction over the tunnel, unloading due to excavation of the rock over the tunnel, and uneven load due to asymmetric excavation or construction. To reinforce a cracked tunnel in Chongqing City, China, steel arches were installed to improve its bearing capacity, but some steel arches failed during the excavation of ground over the tunnel. Therefore, the scheme of “steel arch + shotcrete + tube column + transversal horizontal bracing” (hereinafter referred to as SASTCT) was proposed to ensure tunnel safety due to unloading and uneven load during the subsequent construction procedures. Numerical analysis indicated that the SASTCT measure can ensure the safety of the traffic and subsequent construction, which can provide some suggestions for similar tunnel upgrades in the future.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.