Abstract
To successfully execute the construction project, many efforts have been made to apply 3D-based Building Information Modeling (BIM). In practice, however, a data storage and retrieval system has yet to be developed because an extensive database structure is required in time/cost analysis for a particular project. This study is aimed to develop a generic BIM database structure and customize it for an aged-housing remodeling project. Throughout the Vicosoft's Constructor software, the pre-made BIM database structure has been developed. The case study has shown the efficacy and usability of BIM-based project management practice. The complete set of 378 pre-made recipe types have been defined with 55 methods and 47 resource items. The proposed BIM application process has been proven to be a useful tool for efficient project management by identifying work items and recognizing the relationships among activities. The advantages of using the pre-made BIM database to the time/cost analysis hare twofold: human error reduction and work efficiency. The limitations in and barriers against using the BIM database have also been discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.