Abstract

Abstract A case study of rapid variation (ramp event) of photovoltaic (PV) power generation on 18 April 2016 for the Tokyo Electric Power Company (called “TEPCO”) power area is considered in this study. PV system installation in the TEPCO area has been increasing (approximately 10 GW PV system capacity). Quasi real-time monitoring of PV power generation by using satellite-estimated solar radiation is performed. Under assumptions of future PV system installation scenarios (from 21.78 GW to 85.76 GW in the TEPCO area), temporal and spatial variations of PV power generation are estimated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.