Abstract

Nowadays complex control systems are rising and especially hybrid control architectures which are developed to face the manufacturing control challenges that occur with the last industrial revolution and the emerging of industry 4.0. This work presents an application, on a testing platform, of a scheduling algorithm, with multi-criteria objectives, developed for Acta-Mobilier company suffering from high rework rate. This algorithm will inscribe itself in a hybrid control system based on smart entities. The main objective is to validate the contribution of the proposed algorithm in a disturbed environment. The platform, implemented with a multi-agent's system, allows to measure the reliability of the proposed algorithm used on a complex system in the particular case of high rework rate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.