Abstract

ABSTRACT This article describes an extended assessment of a manufacturing plant. The assessment was extended by adding monitoring of selected electrical systems in the plant with portable data loging equipment, making two additional plant visits to install and remove equipment, and identifying possible assessment recommendations for later investigation. Monitoring identified three recommendations about equipment being left on that likely would not have been identified during a usual assessment, and provided data for quantification of savings. Plant management identified a desirable operational change from the monitored data. In addition, the additional time spent in the plant increased the potential recommendation list and the final recommendation list by about a factor of two.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.