Abstract

The speedy development and extensive application of computers have helped play a significant role in a new technological revolution. The importance of FMS flexibility in producing a variety of products and adapting rapidly to customer requirements makes FMSs attractive. Further, FMSs are most appropriate for largevariety and medium- to high-volume production environments. However, the module of the FMS production planning system is not perfect. This paper focuses on a new scheme for FMS production planning and dispatching under the realistic assumptions promoted by a particular flexible manufacturing factory. Some practical constraints such as fixture uniqueness, limited tool magazine capacity, and a given number of pallets are considered. The simulation results indicate that the scheme provides a good production plan, according to the short-term plans from the MIS Department. Some conclusions are drawn and a discussion is presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.