Abstract
AbstractWe describe a real‐life problem arising at a crane rental company. This problem is a generalization of the basic crew scheduling problem given in Mingozzi et al. [18] and Beasley and Cao [6]. We formulate the problem as an integer programming problem and establish ties with the integer multicommodity flow problem and the hierarchical interval scheduling problem. After establishing the complexity of the problem we propose a branch‐and‐price algorithm to solve it. We test this algorithm on a limited number of real‐life instances. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 723–742, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10044
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.