Abstract

The purpose of this paper is to propose a new branch-and-bound algorithm for a class of scheduling problems to minimize total tardiness on identical parallel machines. In this algorithm, the Lagrangian relaxation technique is applied to obtain a tight lower bound. In addition, the job dominance conditions for the single machine total tardiness problem are utilized for both restricting branches and improving the lower bound. As will be shown by computational experiments, instances with up to 25 jobs and with any number of machines are optimally solved by the proposed algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.