Abstract

In this paper, a bivariate replacement policy (n, T) for a cumulative shock damage process is presented that included the concept of cumulative repair cost limit. The arrival shocks can be divided into two kinds of shocks. Each type-I shock causes a random amount of damage and these damages are additive. When the total damage exceeds a failure level, the system goes into serious failure. Type-II shock causes the system into minor failure and such a failure can be corrected by minimal repair. When a minor failure occurs, the repair cost will be evaluated and minimal repair is executed if the accumulated repair cost is less than a predetermined limit L. The system is replaced at scheduled time T, at n-th minor failure, or at serious failure. The long-term expected cost per unit time is derived using the expected costs as the optimality criterion. The minimum-cost policy is derived, and existence and uniqueness of the optimal \( n^{*} \) and \( T^{*} \) are proved. This bivariate optimal replacement policy (n, T) is showed to be better than the optimal \( T^{*} \) and the optimal \( n^{*} \) policy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.