Abstract

This article studies an optimal imperfect preventive maintenance policy based on a cumulative damage model for a used system with initial variable damage. The used system is subject to shocks occurring to a non-homogeneous Poisson process, and suffers one of two types of shocks with stochastic probability: type-I shock (minor) yields a random amount of additive damage of the system, or type-II shock (catastrophic) causes the system to fail. A bivariate preventive maintenance schedule (n,T) is presented in which the system undergoes preventive maintenance at a planned time T and the nth type-I shock, or corrective maintenance at any type-II shock and the total damage exceeds a threshold level, whichever occurs first. The optimal preventive maintenance schedule which minimizes the expected cost rate is derived analytically and discussed numerically.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.