Abstract

A bi-level load restoration optimisation strategy is proposed for the transmission system with wind farm-energy storage combined systems (WESs), taking the variant length of time steps into account. The upper level model is proposed to maximise weighted restored loads, and formulated as a mixed-integer linear programming model. After solving the upper model, the optimal load pickup and transmission line restoration scheme can be obtained and delivered to the lower level model. The lower level model adopts a non-linear model to minimise the length of the current time step, which is delivered to the upper lever model. By iteratively solving the upper and lower level models, the optimal load pickup and transmission line restoration scheme as well as the optimal length of current time step can be obtained. To minimise the gap between the scheduled generation of the WES and its actual power generation, a real-time energy storage (ES) dispatch strategy is proposed taking maximum charging-discharging cycles of the ES into account. The entire load restoration strategy can be obtained by iteratively solving the proposed model with updated operational conditions of power systems. Finally, two test systems are employed to verify the validity and correctness of the proposed model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.