Abstract
The occurrence of a disaster brings about damages, destruction, ecological disruption, loss of human life, human suffering, deterioration of health and health service of sufficient magnitude to require external assistance, demanding the mobilization and deployment of emergency rescue units within the affected area, in order to reduce casualties and economic losses. The scheduling of those units is one of the key issues in the emergency response phase and can be seen as a generalization of the unrelated parallel machine scheduling problem with sequence and machine dependent setup. The objective is to minimize the total weighted completion time of the incidents to be attended, where the weight correspond to its severity level. We propose a biased random-key genetic algorithm to tackle this problem, considering fuzzy required processing times for the incidents, and compare the solutions with those generated by a constructive heuristic, from the literature, developed to deal with this problem. Our results show that the genetic algorithm's solutions are 2.17% better than those obtained with the constructive heuristic when applied to instances with up to 40 incidents and 40 rescue units.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.