Abstract

Resource allocation is one of the core issues in project scheduling to ensure the effective use of scare renewable resources, and has been regularly encountered in production systems in the manufacturing and service industries. The transfers of renewable resources between activities generally incur certain scheduling costs and affect the robustness of a certain schedule in an uncertain environment. To address this issue, a bi-objective optimisation model is proposed to make the resource transfer decisions, which aims to minimise the transfer cost and maximise solution robustness in the presence of activity duration variability. The proposed model employs a novel resource-oriented flow formulation that is different from those of the previous literature. A NSGA-II and a Pareto simulated annealing (PSA) algorithm have been applied as the solution methodologies. Besides, the effectiveness of the metaheuristics are evaluated in comparison with a -constraint method. In detail, the algorithms are carried out on a set of benchmarks and are compared to test their efficiencies based on four performance metrics: number of non-dominated solutions, general distance, hypervolume and spacing. Finally, a case study of a real project further indicates that the suggested model and algorithms are applicable and beneficial to the problem in practice.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.