Abstract

This paper focuses on developing a bi-level programming model for rough stochastic multi-mode resource constrained project scheduling problem (RS-MRCPSP/bi-level). The metal structure installation project (MSIP) in Wudongde Hydropower Station is considered as the prototype, and then it is extended to be a generalised bi-level MRCPSP. In the upper level, the construction contractor is responsible for the investment on the activity, while the outsourcing partner is in charge of construction and implementation in the lower level. In order to deal with the rough stochastic parameters, the rough stochastic expected value operator is employed. Subsequently, in order to obtain the optimal schedule, an interactive method-based passive congregation particle swarm optimisation (IM-based PCPSO) is designed. Finally, a practical application for MSIP is presented to highlight the practicability of proposed model and solution method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.