Abstract

This paper considers the problem of scheduling a set of jobs subject to arbitrary release dates and sequence-dependent setup times on a single machine with the objective of minimizing the maximum completion of all the jobs, or makespan. This problem is often found in manufacturing processes such as painting and metalworking. A new mixed integer linear program (MILP) is firstly proposed. Because the problem is known to be NP-hard, a beam search heuristic is developed. Computational experiments are carried out using a well-known set of instances from the literature. Our results show that the proposed heuristic is effective in finding high quality solutions at low computational cost.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call