Abstract

The job shop scheduling problem has been a major target for many researchers. Unfortunately, though, most of the past studies assumed that a job consists of only a single part. If we assume that a job consists of a batch as in many real manufacturing environment, then we can obtain an improved schedule. However, then, the size of the scheduling problem would become too large to be solved in practical time limit. So, we proposed an algorithm to get an improved schedule by splitting the original batch into smaller batches, and thereby can meet the due date requirement, and adapt to unexpected dynamic events such as machine failure, rush order and expediting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.