Abstract

We evaluate industrial demand-side management (DSM) options using utility avoided costs, including long-term marginal costs of power generation, transmission and distribution in Maharashtra. Implementation of DSM options will save 1570 MW of peak demand and 12,510 GWh of energy by 2000 AD. The marginal savings to the utility will be Rs. 56,580 million (MM) and the savings to the customer, due to reduced energy bills, will be Rs. 36,210 MM.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.