Abstract

In 2007 RWE Power, BASF and Linde entered into a cooperation to develop an optimized post combustion capture technology for power plants. In mid-2009 a CO2 capture pilot plant will be commissioned at RWE Power’s lignite-fired power plant at Niederaussem, Germany. The pilot plant comprises all significant components of a large post combustion capture plant but on a smaller scale. Some capture process optimization measures are implemented that should increase the overall efficiency and reduce the costs of a commercial capture plant. The design of the pilot plant - engineering, procurement and construction by Linde - allows testing the performance and stability of optimized CO2 solvents, which BASF is currently developing. On the basis of an elaborated solvent selection methodology (pre-selection, screening, etc.) comprehensive experiments are carried out in order to examine solvent performance, and some measures for the optimization of the process configuration are developed. The 18-month pilot plant testing programme will allow the performance of the optimized solvent and the process to be evaluated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call