Abstract

886447 Tunnel boring at Vinstra power plant, Norway — excavation of the 17-km long headrace tunnel by use of tunnel-boring machines : Borg, A Proc Tunnelling '88, London, 18–21 April 1988P9–23. Publ London: IMM, 1988

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.