Abstract

The engineering and design features of the 765-kV substations that will be placed in service in early 1969 on the American Electric Power system are discussed. The electrical and physical details of the stations are reviewed in detail, and major factors in equipment selection are discussed. An analysis of this paper plus the companion papers on 765-kV station insulation coordination and relaying will yield a reasonably complete understanding of the engineering and design thinking which is part of the station designs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.