AbstractThis paper provides insight into calibrating a systems engineering cost model (COSYSMO) by providing a process that organizations can follow to improve their estimation accuracy. A specific example is provided from Raytheon Missile Systems to illustrate how data are collected and how they influence the cost estimating relationship. The results from this specific case are generalized to other organizations who wish to improve their cost estimation capabilities in systems engineering.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.