Abstract

This paper discusses the testing requirements and results of the tests on the proposed designs for the 525-kV self-contained oil-filled cable systems to be installed for the first three transformer circuits at Grand Coulee Third Powerplant. Details of the test assemblies, methods, controls, measurements, problems, and results are given for tests that: confirm the cable system rating; prove electrical and thermal stability; demonstrate handling capability and mechanical integrity; compare 50 Hz and 60 Hz power factors; and assure satisfactory operation at ambient temperatures as low as minus 27° C.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.