Abstract

AbstractThe goal of this paper is to demonstrate how the concurrent engineering method embodied in the Integrated Product Team (IPT) philosophy has impacted the specification development process on the F‐22 program. The article will examine the concurrent engineering process as it applies strictly to specification development.[1] In particular, the success of the specification development process will be attributed to three main factors: (1) maintaining flexibility in the Preliminary Allocated Baseline (PAB) until Functional Configuration Audit (FCA), (2) Increasing communication and trust between the contractor and the customer by making the customer an integral member of the IPT, and (3) taking advantage of the automated technology to redesign the specification development process. While the F‐22 program is a multi‐corporate endeavor, these principles can be applied to any development effort.]

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.