Abstract

In the assembly process of high-mix low-volume production line, the control system must be flexible and robust to adapt to changes in state of manufacturing line such as switching product types, stopping for a short time, and out of stock of parts. In this paper, we propose a multi-agent based control system of the assembly process. Proposed agents work with BOM and their behavior depends on BOM tree structure. And we show mechanism of the multi-agent based control system to work with limited resources. In addition, a simulation system is developed to verify behavior of agents in various status changes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.