Abstract

Abstract3D images combine visual and geometric information making them an obvious source for capturing and characterising rock surfaces especially when there are constrained time and access conditions. By taking photographs with an off‐the‐shelf camera and using modern algorithms from photogrammetry, 3D imaging has become state of the art on many conventional tunnel construction sites. Data is acquired on a daily basis, processed, geologically assessed, and finally stored in a suitable data base. The contribution provides a brief introduction of the technology and its measurement capabilities, as well as a description of the practical application during the construction of the 8 km long Gleinalmtunnel in Austria.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.