Abstract

Proper operation of the ventilation system of a tunnel requires a regular adjustment of its parameters. This work, however, needs a high level knowledge about the ventilation control. In addition to that, this work may be risky because no one can tell the adjustment to be right until it is verified by the actual operation of it in the tunnel. In order to adjust parameters efficiently and effectively, avoiding the above risk, Japan Highway Public Corporation has developed a new system that has a function of the simulation for the new ventilator operation in it. The system is now working successfully. This paper introduces its outlines and results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.