Abstract

This paper describes the parts input problem of production system where two FTLs (Flexible Transfer Lines) are linked under JIT production management. In this paper, new parts input real-time control method REPAIR is proposed. REPAIR is useful when the FTLs are operated under the production order that is different from the pre-decided production scheduling. By applying REPAIR for a virtual production system, it is ascertained that REPAIR is a useful real-time control system that does not give a bad influence if a production order that is different from pre-decided production scheduling is suddenly given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.