Abstract

In this research, we proposed the method for controlling the trade-off between the calculation cost and the performance of the solution for obtaining the schedule solution in process scheduling. Since computational cost indispensable in order to calculate the schedule solution corresponding to a demand cannot be predicted, it uses the policy of improving a solution gradually to require a provisional solution. The reptition is completed when a schedule solution with the desired cost performance while this system monitors calculation time is obtained.Such a technique was built using the knowledge based system, implemented and evaluated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.